top of page

Task 3

Pre - Production 

Sizzlereel 

The video to the left is a sizzlereel of my FMP music video. I used a number of clips that resemble what I am trying to make and so it gives off the same feel to it through out. I want the video to have a very surreal look and feel to it. Which I believe the use of paint will help because this gives me more of an opportunity to experiment with colour theory. I can use the colours to make the audience feel emotions that the song is trying to get across. The effects I've used in this video I feel also help to add to the style I am trying to create. 

The file to the right is a mood board for my video. It contains a number of images that tie to my project. I chose a number of images from music videos that also use paint as their concept along with pictures of street art I have taken that are what are inspiring me for my work and I think will suit my work and the style I am going for. The reason I chose mostly images instead of text for my mood board is because I want to have the film have the feeling of a painting. My originally idea was for at any point of the film you can pause it and it will resemble a painting, if I use still images instead of anything else it resembles that feeling better than text or moving footage. 

Screen Shot 2019-04-30 at 14.14.07.png
Screen Shot 2019-04-30 at 14.13.29.png

The file to the left is a story board I created using image from the internet to best suit the style I am aiming for. I talked about length of time these will be on screen but this isn't final until the footage is taken and I am able to edit it together. The reason a story board is important because it allows the director to have the story of the film in their recent memory which means it will be easier for the film maker to create the video in their original idea. This helps to make the filming process easier and smoother. 

The file to the right is the schedule for my final major project. I wrote about what my schedule should be like until the end of the project. I wrote about when I will be researching about my project, when I will be doing production work as well and when I will be doing editing, filming and post production. My schedule takes me up to the very last day until the project is due in. So if I do follow the schedule closely it'll make it extremely close for me. It also seems easy to fall behind with the work so I will need to work on the weekends more and I will also need to do at least one hour and thirty mins of journal entry each day to remain on target and keep the same level of quality throughout. 

Screen Shot 2019-04-30 at 14.14.29.png
53539922_389231391640840_383369022647618
54401847_1088179304700300_68016822276807
53588517_556602381512247_345335694383644
54194686_326508361327474_273630680653496
53211731_266877744213226_375919798298188
53596200_262751681282256_215628901815156
54385160_2508151712589930_20937173747829
53465127_974136922781770_656277625668370
53249636_835673003450695_275835787300726
53343683_1055291688005932_71024227053993
53429816_1059847134223685_87408104365568
53599053_2047925135243757_68088420627172
53199752_516756195518433_452793376960833
54520118_1319920154813367_51774462548498
53584694_635786993545119_108893076109393
53513219_425525821526577_820965226485225
53278909_427122164496465_274958414387976
54729883_257649211777409_372785595735552
52834737_249183215860558_949157742004666
53588332_795534950822480_850195332510777
53140447_312423522807203_218021641410156
53916251_801086086915320_757711484757422
53280018_292610204740631_572204467630374

Location  Recce and Risk Assessment 

53535794_709473122795110_294340582599085
Screen Shot 2019-04-30 at 14.14.54.png

The image to the right is the location recce for my music video. Because most of the filming was done in a studio for the reasoning that the studio is easier to control and is easier to work and know all the colours in thee frame. So by filming in the film and TV studio I could easily get the look I want. It was also close to editing soft ware which made re shoots a lot easier. Along with being close to a food source for the comfort of people working behind the scenes and actors. We also had medical staff near by because I was filming at college which made the risk of a paint related issues being very minimum. The only concern was the clean up with paint but by bring in blankets it would get rid of the issue. 

2.JPG
1.JPG
3.JPG

A risk assessment is highly important because it ensures the safety of everyone working on the project. Also with everyone being aware of the risks and the risks to the equipment. The events that could happen are less likely because everyone is aware what it is and are going out of their way by taking extra steps to ensure everything is working well. The main issues and safety hazard was the use of paint. I used paint in all of the scenes for my music video. Having someone eat the paint would result in them becoming extremely ill but by taking steps such as making sure everyone is sensible around the paint this small hazard becomes harmless. Another issue was the paint making contact with the filming equipment which had a high chance of happening. But making sure it is kept a safe distance away from the paint makes this issue even less likely especially if the people/ person using the equipment are aware of what they are doing and are being safe around the paint. 

Links 

Mood board 

Location Recce

Story Board

Schedule 

Script 

References 

bottom of page